NCC 2025 Volume Two
Part H2 Damp and weatherproofing
19 clauses · Open on NCC Online ↗
- H2O1 ObjectiveThe Objective is to— safeguard occupants from illness or injury and protect the building from damage caused by— surface water; and external water…
- H2F1 Surface waterA building including any associated sitework is to be constructed in a way that protects people and other property from the adverse effects of…
- H2F2 Weatherproofing and dampnessA building is to be constructed to provide resistance to moisture from the outside and moisture rising from the ground. Limitations H2F2 does not…
- H2F3 Drainage from swimming poolsAdequate means for the disposal of swimming pool water and drainage is to be provided to a swimming pool.
- H2P1 Rainwater managementSurface water, resulting from a storm having an annual exceedance probability of 5% and which is collected or concentrated by a building or…
- H2P2 WeatherproofingA roof and external wall (including openings around windows and doors) must prevent the penetration of water that could cause— unhealthy or…
- H2P3 Rising damp NSW SAMoisture from the ground must be prevented from causing— unhealthy or dangerous conditions, or loss of amenity for occupants; and undue dampness or…
- H2P4 Drainage from swimming pools NTA swimming pool must have adequate means of draining the pool in a manner which will not— cause illness to people; or affect other property.
- Table H2V1a Risk factors and scoresRisk factor | Category | Risk severity | Score Wind region | Region A(0-5) (AS/NZS 1170.2) | Low to medium | 0 Region B1-2 (AS/NZS 1170.2) | Low to…
- Table H2V1b Serviceability wind pressureStage number | Serviceability wind pressure 1 | 15% to 30% 2 | 20% to 40% 3 | 30% to 60%
- H2V1 WeatherproofingCompliance with H2P2 for weatherproofing of an external wall is verified when— a prototype passes the procedure described in (2); and the external…
- H2D1 Deemed-to-Satisfy ProvisionsWhere a Deemed-to-Satisfy Solution is proposed, Performance Requirements H2P1 to H2P4 are satisfied by complying with H2D2 to H2D8. (2) Where a…
- H2D2 DrainagePerformance Requirement H2P1 is satisfied for drainage if it is designed and constructed in accordance with — AS/NZS 3500.3; or provided the…
- H2D3 Footings and slabs NSWPerformance Requirement H2P3 is satisfied for footings and slabs if they are installed in accordance with H1D4(1)(a) or (b).
- H2D4 Masonry NSW SAH2D4(2)— applies to every external wall (including the junction between the wall and any window or door) of a Class 1 building; and does not apply…
- H2D5 Subfloor ventilation NSWPerformance Requirement H2P3 is satisfied for subfloor ventilation if it is in accordance with Part 6.2 of the ABCB Housing Provisions.
- H2D6 Roof and wall cladding VICPerformance Requirement H2P1 is satisfied for gutters and downpipes if they are designed and constructed in accordance with one of the following:…
- H2D7 GlazingPerformance Requirement H2P2 is satisfied for weatherproofing for glazing if it is in accordance with H1D8(1).
- H2D8 External waterproofingPerformance Requirement H2P2 is satisfied for the design and construction of external waterproofing for roofing systems on flat roofs, roof…