H7V2 Buildings in bushfire prone areas
Part H7 Ancillary provisions and additional construction requirements · NCC 2019: V2.7.2
(1) Compliance with H7P5 is verified if the ignition probability for a building exposed to a design bushfire does not exceed 10%.
(2) Bushfire design actions must be determined in consideration of the annual probability of a design bushfire derived from—
assigning the building or structure an Importance Level in accordance with (3); and
determining the corresponding annual probability of exceedance in accordance with Table H7V2.
(3) A building or structure's Importance Level must be identified as one of the following:
Importance Level 1 — where the building or structure presents a low degree of hazard to life and other property in the case of failure.
Importance Level 2 — where the building or structure is not of Importance Level 1 or 4 and is a Class 1a or 1b building accommodating 12 people or less.
Importance Level 4 — where the building is a Class 10c building and is subject to a necessary ‘defend in place’ strategy.
(4) The ignition probability for a building must be assessed by application of the following:
An event tree analysis of relevant bushfire scenarios.
Design bushfire conditions that include combinations of the following actions appropriate to the distance between the building and the bushfire hazard:
Direct attack from airborne burning embers.
Burning debris and accumulated embers adjacent to a building element.
Radiant heat from a bushfire front.
Direct flame attack from a bushfire front.
(5) Applied fire actions must allow for reasonable variations in—
fire weather; and
vegetation, including fuel load, burning behaviour of vegetation (including the potential for crown fires); and
the distance of the building from vegetation; and
topography, including slopes and features that may shield; and
ignition of adjacent buildings, building elements, plants, mulch and other materials; and
effective size of fire front; and
duration of exposure; and
flame height; and
flame tilt; and
flame adhesion to sloping land; and
the height of the building and its elements.
(6) The assessment process must include consideration of—
the probability of non-complying construction of critical aspects of an approved design; and
the probability of critical aspects of an approved design being fully functional during the life of the building; and
inclusion of safety factors; and
sensitivity analysis of critical aspects of a proposed design.
Table H7V2 Annual Probability of Exceedance (APE) for design bushfire actions
Importance Level
Complex analysis APE for bushfire exposure
Simple analysis APE for weather conditions (design bushfire)
1
No requirement
No requirement
2
1:500
1:50
3
N/A for Class 1 and 10 buildings
N/A for Class 1 and 10 buildings
4
1:2000
1:200
Table Notes
Complex analysis must consider the probability of ignition, fire spread to the urban interface and penetration of the urban interface coincident with fire weather conditions.