Performance Requirement · NCC 2025 Volume Two

H7P5 Buildings in bushfire prone areas

Part H7 Ancillary provisions and additional construction requirements · NCC 2019: TAS P2.7.5, P2.7.5

Open H7P5 on NCC Online ↗
Varied in NSW, TAS. Check the variation for your state.

A Class 1 building, or a Class 10a building or deck associated with a Class 1 building. that is constructed in a designated bushfire prone area must be designed and constructed to—

reduce the risk of ignition from a design bushfire with an annual exceedance probability not more than 1:50 years; and

take account of the assessed duration and intensity of the fire actions of the design bushfire; and

be designed to prevent internal ignition of the building and its contents; and

maintain the structural integrity of the building for the duration of the design bushfire.

Changed since NCC 2022 (minor wording). See NCC 2022 Volume Two H7P5, or show what changed.

A Class 1 building building, or a Class 10a building or deck associated with a Class 1 building building. that is constructed in a designated bushfire prone area must … of the building for the duration of the design bushfire.

Removed words are struck through; added words are highlighted. Comparison of the text only.

State and territory variations all clauses side by side →

Defined terms used