New South Wales variation · NCC 2025 Volume Two

NSW H7P5 Buildings in bushfire prone areas

NSW Part H7 Ancillary provisions and additional construction requirements · varies H7P5 Buildings in bushfire prone areas

Open on NCC Online ↗

Delete clause H7P5 and insert NSW H7P5 as follows:

A Class 1 building, or a Class 10a building or deck associated with a Class 1 building. that is constructed in a designated bushfire prone area must be designed and constructed to—

reduce the risk of ignition from a design bushfire with an annual exceedance probability not more than 1:50 years; and

take account of the assessed duration and intensity of the fire actions of the design bushfire; and

be designed to prevent internal ignition of the building and its contents; and

maintain the structural integrity of the building for the duration of the design bushfire. Except as amended by Planning for Bush Fire Protection.

New in NCC 2025. No NSW H7P5 in NCC 2022 Volume Two; it may have moved or been renumbered.

The national clause

Other states and territories