B1P3 Buildings in flood areas
Part B1 Structural provisions · NCC 2019: BP1.3
(1) A building in a flood hazard area, must be designed and constructed, to the degree necessary, to resist flotation, collapse or significant permanent movement resulting from the action of hydrostatic, hydrodynamic, erosion and scour, wind and other actions during the defined flood event.
(2) The actions and requirements to be considered to satisfy (1) include but are not limited to—
flood actions; and
elevation requirements; and
foundation and footing requirements; and
requirements for enclosures below the flood hazard level; and
requirements for structural connections; and
material requirements; and
requirements for utilities; and
requirements for occupant egress.
Applications
B1P3 only applies to—
a Class 2 or 3 building or a Class 4 part of a building; and
a Class 9a health-care building; and
a Class 9c building.
Changed since NCC 2022. See NCC 2022 Volume One B1P3, or show what changed.
Glass installations that are at risk of being subjected to human impact must have glazing that — if broken on impact, will break (1) A building in a way that is flood hazard area, must be designed and constructed, to the degree necessary, to resist flotation, collapse or significant permanent movement resulting from the action of hydrostatic, hydrodynamic, erosion and scour, wind and other actions during the defined flood event. (2) The actions and requirements to be considered to satisfy (1) include but are not likely limited to cause injury — flood actions; and elevation requirements; and foundation and footing requirements; and requirements for enclosures below the flood hazard level; and requirements for structural connections; and material requirements; and requirements for utilities; and requirements for occupant egress. Applications B1P3 only applies to people; — a Class 2 or 3 building or a Class 4 part of a building; and resists a reasonably foreseeable human impact without breaking; Class 9a health-care building; and is protected or marked in a way that will reduce the likelihood of human impact. Class 9c building.
Removed words are struck through; added words are highlighted. Comparison of the text only.
State and territory variations all clauses side by side →
- QLD Varied This clause has deliberately been left blank. Building work in designated flood areas is regulated by the Building Act 1975…
- SA Varied This clause has deliberately been left blank.