Table · NCC 2025 Volume One

Table B1V1a Annual action models

Part B1 Structural provisions

Open Table B1V1a on NCC Online ↗
Design actionRatio of mean action to nominalCoefficient of variation of the action
Permanent action1.050.10
Annual maximum imposed action0.350.45
Arbitrary-point-in-time imposed action0.250.78
Wind (non-cyclonic regions, Importance Level 1)0.370.47
Wind (non-cyclonic regions, Importance Level 2)0.310.47
Wind (non-cyclonic regions, Importance Level 3)0.290.47
Wind (non-cyclonic regions, Importance Level 4)0.270.47
Wind (cyclonic regions, Importance Level 1)0.190.76
Wind (cyclonic regions, Importance Level 2)0.160.76
Wind (cyclonic regions, Importance Level 3)0.140.76
Wind (cyclonic regions, Importance Level 4)0.130.76
Earthquake (Importance Level 1)0.280.90
Earthquake (Importance Level 2)0.150.90
Earthquake (Importance Level 3)0.120.90
Earthquake (Importance Level 4)0.0840.90
Snow0.290.57

Table Notes

Actions not listed must be considered and derived on a case-by-case basis.

Nominal loads are based on AS/NZS 1170 series of standards.

Table for B1V1 Structural reliability of components

Changed since NCC 2022. See NCC 2022 Volume One Table B1V1a, or show what changed.

Design action | Ratio of mean action to nominal | Coefficient of variation of the action Permanent action | Imposed 1.05 | 0.10 Annual maximum imposed action | Wind action (non-cyclonic) 0.35 | Wind action (cyclonic) | Snow 0.45 Arbitrary-point-in-time imposed action | 0.25 | 0.78 Wind (non-cyclonic regions, Importance Level 1) | 0.37 | 0.47 Wind (non-cyclonic regions, Importance Level 2) | 0.31 | 0.47 Wind (non-cyclonic regions, Importance Level 3) | 0.29 | 0.47 Wind (non-cyclonic regions, Importance Level 4) | 0.27 | 0.47 Wind (cyclonic regions, Importance Level 1) | 0.19 | 0.76 Wind (cyclonic regions, Importance Level 2) | 0.16 | 0.76 Wind (cyclonic regions, Importance Level 3) | 0.14 | 0.76 Wind (cyclonic regions, Importance Level 4) | 0.13 | 0.76 Earthquake action (Importance Level 1) | 0.28 | 0.90 Earthquake (Importance Level 2) | 0.15 | 0.90 Earthquake (Importance Level 3) | 0.12 | 0.90 Earthquake (Importance Level 4) | 0.084 | 0.90 Snow | 0.29 | 0.57 Table Notes Actions not listed must be considered and derived on a case-by-case basis. Nominal loads are based on AS/NZS 1170 series of standards.

Removed words are struck through; added words are highlighted. Comparison of the text only.