B1P3 Glass installations at risk of human impact
Part B1 Structural provisions · NCC 2019: BP1.3
Glass installations that are at risk of being subjected to human impact must have glazing that—
if broken on impact, will break in a way that is not likely to cause injury to people; and
resists a reasonably foreseeable human impact without breaking; and
is protected or marked in a way that will reduce the likelihood of human impact.
Changed in NCC 2025. See NCC 2025 Volume One B1P3, or show what changed.
Glass installations that are at risk of being subjected to human impact must have glazing that — if broken on impact, will break (1) A building in a way that is flood hazard area, must be designed and constructed, to the degree necessary, to resist flotation, collapse or significant permanent movement resulting from the action of hydrostatic, hydrodynamic, erosion and scour, wind and other actions during the defined flood event. (2) The actions and requirements to be considered to satisfy (1) include but are not likely limited to cause injury — flood actions; and elevation requirements; and foundation and footing requirements; and requirements for enclosures below the flood hazard level; and requirements for structural connections; and material requirements; and requirements for utilities; and requirements for occupant egress. Applications B1P3 only applies to people; — a Class 2 or 3 building or a Class 4 part of a building; and resists a reasonably foreseeable human impact without breaking; Class 9a health-care building; and is protected or marked in a way that will reduce the likelihood of human impact. Class 9c building.
Removed words are struck through; added words are highlighted. Comparison of the text only.