C3D7 Vertical separation of openings in external walls
Part C3 Compartmentation and separation · NCC 2019: C2.6
(1) If in a building of Type A construction, any part of a window or other opening in an external wall is above another opening in the storey next below and its vertical projection falls no further than 450 mm outside the lower opening (measured horizontally), the openings must be separated by—
a spandrel which—
is not less than 900 mm in height; and
extends not less than 600 mm above the upper surface of the intervening floor; and
is of non-combustible material having an FRL of not less than 60/60/60; or
part of a curtain wall or panel wall that complies with (a); or
construction that complies with (a) behind a curtain wall or panel wall and has any gaps packed with a non-combustible material that will withstand thermal expansion and structural movement of the walling without the loss of seal against fire and smoke; or
a slab or other horizontal construction that—
projects outwards from the external face of the wall not less than 1100 mm; and
extends along the wall not less than 450 mm beyond the openings concerned; and
is non-combustible and has an FRL of not less than 60/60/60.
(2) The requirements of (1) do not apply to—
an open-deck carpark; or
an open spectator stand; or
a building which has a sprinkler system (other than a FPAA101D or FPAA101H system) complying with Specification 17 installed throughout; or
openings within the same stairway; or
openings in external walls where the floor separating the storeys does not require an FRL with respect to integrity and insulation.
(3) For the purposes of C3D7, window or other opening means that part of the external wall of a building that does not have an FRL of 60/60/60 or greater.