NCC 2025 Volume One
Part C3 Compartmentation and separation
16 clauses · Open on NCC Online ↗
- C3D1 Deemed-to-Satisfy Provisions SAWhere a Deemed-to-Satisfy Solution is proposed, Performance Requirements C1P1 to C1P9 are satisfied by complying with— C2D2 to C2D15, C3D2 to C3D15…
- C3D2 Application of PartC3D3, C3D4 and C3D5 do not apply to a carpark provided with a sprinkler system (other than a FPAA101D or FPAA101H system) complying with…
- Table C3D3 Maximum size of fire compartments or atriaClassification | Type A construction | Type B construction | Type C construction 5, 9b or 9c | Max floor area —8 000 m2 | Max floor area —5 500 m2 |…
- C3D3 General floor area and volume limitationsThe size of any fire compartment or atrium in a Class 5, 6, 7, 8 or 9 building must not exceed the relevant maximum floor area nor the relevant…
- C3D4 Large isolated buildingsThe size of a fire compartment in a building may exceed that specified in Table C3D3 where— the building does not exceed 18 000 m2 in floor area nor…
- C3D5 Requirements for open spaces and vehicular accessAn open space required by C3D4 must— be wholly within the allotment except that any road, river, or public place adjoining the allotment, but not…
- C3D6 Class 9 buildings NSWA Class 9a health-care building must comply with the following: patient care areas must be divided into fire compartments not exceeding 2000 m2. A…
- C3D7 Vertical separation of openings in external wallsIf in a building of Type A construction, any part of a window or other opening in an external wall is above another opening in the storey next below…
- C3D8 Separation by fire wallsConstruction — A fire wall must be constructed in accordance with the following: The fire wall has the relevant FRL prescribed by Specification 5…
- C3D9 Separation of classifications in the same storeyIf a building has parts of different classifications located alongside one another in the same storey — each building element in that storey must…
- C3D10 Separation of classifications in different storeysIf parts of different classification are situated one above the other in adjoining storeys they must be separated as follows: Type A construction —…
- C3D11 Separation of lift shaftsAny lift connecting more than 2 storeys, or more than 3 storeys if the building is sprinklered, (other than lifts which are wholly within an atrium)…
- C3D12 Stairways and lifts in one shaftA stairway and lift must not be in the same shaft if either the stairway or the lift is required to be in a fire-resisting shaft.
- C3D13 Separation of equipmentEquipment other than that described in (2) and (3) must be separated from the remainder of the building with construction complying with (4), if…
- C3D14 Electricity supply systemAn electricity substation located within a building must— be separated from any other part of the building by construction having an FRL of not less…
- C3D15 Public corridors in Class 2 and 3 buildingsIn a Class 2 or 3 building, a public corridor, if more than 40 m in length, must be divided at intervals of not more than 40 m with smoke-proof…