C4D15 Openings for service installations
Part C4 Protection of openings · NCC 2019: C3.15
(1) The requirements of (2) apply where an electrical, electronic, plumbing, mechanical ventilation, air-conditioning or other service penetrates a building element (other than an external wall or roof) that is required to have an FRL with respect to integrity or insulation or a resistance to the incipient spread of fire.
(2) An installation mentioned in (1) must comply with any one of the following:
Tested systems — the following applies:
The service, building element and any protection method at the penetration—
are identical with a prototype assembly of the service, building element and protection method which has been tested in accordance with AS 4072.1 and AS 1530.4 and has achieved the required FRL or resistance to the incipient spread of fire; or
differ from a prototype assembly of the service, building element and protection method in accordance with Section 4 of AS 4072.1.
It complies with (i) except for the insulation criteria relating to the service if—
the service is a pipe system comprised entirely of metal (excluding pipe seals or the like); and
any combustible building element is not located within 100 mm of the service for a distance of 2 m from the penetration; and
combustible material is not able to be located within 100 mm of the service for a distance of 2 m from the penetration; and
it is not located in a required exit.
The determination of the required FRL must be confirmed in a report from an Accredited Testing Laboratory in accordance with Specifications 1 and 2.
Ventilation and air-conditioning — in the case of ventilating or air-conditioning ducts or equipment, the opening is protected in accordance with AS 1668.1.
Compliance with Specification 13 — the following applies:
The service is a pipe system comprised entirely of metal (excluding pipe seals or the like) and is installed in accordance with Specification 13 and it—
penetrates a wall, floor or ceiling, but not a ceiling required to have a resistance to the incipient spread of fire; and
connects not more than 2 fire compartments in addition to any fire-resisting service shafts; and
does not contain a flammable or combustible liquid or gas.
The service is sanitary plumbing installed in accordance with Specification 13 and it—
is of metal or UPVC pipe; and
penetrates the floors of a Class 5, 6, 7, 8 or 9b building; and
is in a sanitary compartment separated from other parts of the building by walls with the FRL required by Specification 5 for a stair shaft in the building and a self-closing –/60/30 fire door.
The service is a wire or cable, or a cluster of wires or cables installed in accordance with Specification 13 and it—
penetrates a wall, floor or ceiling, but not a ceiling required to have a resistance to the incipient spread of fire; and
connects not more than 2 fire compartments in addition to any fire-resisting service shafts.
The service is an electrical switch, outlet, or the like, and it is installed in accordance with Specification 13.
Changed since NCC 2022 (minor wording). See NCC 2022 Volume One C4D15, or show what changed.
(1) The requirements of (2) apply where an electrical, electronic, … the case of ventilating or air-conditioning ducts or equipment, the installation opening is protected in accordance with AS 1668.1. Compliance with Specification 13 — … like, and it is installed in accordance with Specification 13.
Removed words are struck through; added words are highlighted. Comparison of the text only.