Deemed-to-Satisfy Provision · NCC 2025 Volume One
E4D1 Deemed-to-Satisfy Provisions
Part E4 Visibility in an emergency, exit signs and warning systems · NCC 2019: E4.0
Varied in SA. Check the variation for your state.
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements E4P1 to E4P3 are satisfied by complying with—
in a building containing an atrium, Part G3; and
in a building in an alpine area, Part G4; and
for a building containing an occupiable outdoor area, Part G6; and
for additional requirements for Class 9b buildings, Part I1; and
for farm buildings and farm sheds, Part I3.
(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Same wording in NCC 2022 Volume One. See NCC 2022 Volume One E4D1.
State and territory variations all clauses side by side →
Clauses referred to
- E4P1 Visibility in an emergency
- E4P3 Emergency warning and intercom systems
- E4D2 Emergency lighting requirements
- E4D9 Emergency warning and intercom systems
- A2G2 Performance Solution
- A2G4 A combination of solutions