Deemed-to-Satisfy Provision · NCC 2025 Volume One
F1D3 Stormwater drainage
Part F1 Water management · NCC 2019: F1.1
Stormwater drainage must be designed and constructed in accordance with AS/NZS 3500.3.
Same wording in NCC 2022 Volume One. See NCC 2022 Volume One F1D3.
Can't meet F1D3? A Performance Solution must meet the Performance Requirements it satisfies: F1P1. Start a Performance Solution →