Deemed-to-Satisfy Provision · NCC 2025 Volume One
G2D4 Incinerator rooms
Part G2 Boilers, pressure vessels, heating appliances, fireplaces, chimneys and flues · NCC 2019: G2.4
(1) If an incinerator is installed in a building, any hopper giving access to a charging chute must be—
non-combustible; and
gas-tight when closed; and
designed to return to the closed position after use; and
not attached to a chute that connects directly to a flue unless the hopper is located in the open air; and
not located in a required exit.
(2) A room containing an incinerator must be separated from other parts of the building by construction with an FRL of not less than 60/60/60.
New in NCC 2025. No G2D4 in NCC 2022 Volume One; it may have moved or been renumbered.
Can't meet G2D4? A Performance Solution must meet the Performance Requirements it satisfies: G2P1, G2P2. Start a Performance Solution →