Deemed-to-Satisfy Provision · NCC 2025 Volume One
G3D7 Means of egress
Part G3 Atrium construction · NCC 2019: G3.7
All areas within an atrium must have access to at least 2 exits.
Same wording in NCC 2022 Volume One. See NCC 2022 Volume One G3D7.
Part G3 Atrium construction · NCC 2019: G3.7
All areas within an atrium must have access to at least 2 exits.