Deemed-to-Satisfy Provision · NCC 2025 Volume One

G4D4 Emergency lighting

Part G4 Construction in alpine areas · NCC 2019: G4.4

Open G4D4 on NCC Online ↗

In a Class 2, 3, 5, 6, 7, 8 or 9 building or Class 4 part of a building, a system of emergency lighting must be installed in accordance with the Deemed-to-Satisfy Provisions of Part E4 —

in every stairway (other than those within a sole-occupancy unit in a Class 2 or 3 building or Class 4 part of a building); and

in every public corridor or the like leading to an exit; and

externally above every doorway opening to a road or open space; and

in any storey of the building if illumination sufficient for safe egress will not be available under conditions of emergency.

New in NCC 2025. No G4D4 in NCC 2022 Volume One; it may have moved or been renumbered.
Can't meet G4D4? A Performance Solution must meet the Performance Requirements it satisfies: G4P1, G4P2, G4P3, G4P4. Start a Performance Solution →

Defined terms used