J1V3 Verification using a reference building
Part J1 Energy efficiency performance requirements · NCC 2019: JV3
(1) For a Class 3, 5, 6, 7, 8 or 9 building, compliance with J1P1 is verified when—
it is determined that—
the annual greenhouse gas emissions of the proposed building are not more than 97% of the annual greenhouse gas emissions of a reference building when the proposed building is modelled with the proposed services; and
the annual greenhouse gas emissions of the services of the proposed building are not more than the annual greenhouse gas emissions of the services of the reference building when the proposed building is modelled with the same services as the reference building; and
in the proposed building—
if a Class 5 building, a thermal comfort level of between a Predicted Mean Vote of -1 to +1 is achieved across not less than 95% of the floor area of all occupied zones for not less than 98% of the annual hours of operation of the building; or
a dry bulb room temperature is maintained across not less than 95% of the floor area of all occupied zones, other than any room containing an indoor swimming pool, for not less than 95% of the annual hours of operation between—
18°C and 25°C for conditioned spaces with transitory occupancy; and
21°C and 24°C for all other conditioned spaces; or
in climate zone 1, the 98th percentile zone cooling load across the hours of operation does not exceed 110% of the 98th percentile load in the corresponding zone of the reference building, across 95% of the assessable floor area; or
in climate zone 8, the 98th percentile zone heating load across the hours of operation does not exceed 110% of the 98th percentile load in the corresponding zone of the reference building, across 95% of the assessable floor area; or
in climate zones 2 to 7—
the 98th percentile zone cooling load across the annual hours of operation does not exceed 120% of the 98th percentile load of the corresponding zone of the reference building, across 95% of the assessable floor area; and
the 98th percentile zone heating load across the annual hours of operation does not exceed 120% of the 98th percentile load of the corresponding zone of the reference building, across 95% of the assessable floor area; and
the building complies with the additional requirements in Specification 33.
(2) The calculation method used for (1) must comply with—
ANSI/ASHRAE Standard 140; and
Specification 34; and
Specification 48.
Changed since NCC 2022. See NCC 2022 Volume One J1V3, or show what changed.
(1) For a Class 3, 5, 6, 7, 8 or 9 building or common area of a Class 2 building, compliance with J1P1 is verified when — it is determined that — the annual greenhouse gas emissions of the proposed building are not more than 97% of the annual greenhouse gas emissions of a reference building when the proposed building is modelled with the proposed services; and the annual greenhouse gas emissions of the services of the proposed building are not more than the annual greenhouse gas emissions of a the services of the reference building when — the proposed building is modelled with the proposed services; and the proposed building is modelled with the same services as the reference building; and in the proposed building — if a Class 5 building, a thermal comfort level of between a Predicted Mean … 98% of the annual hours of operation of the building; or a dry bulb room temperature is maintained across not less than 95% of the floor area of all occupied zones, other than any room containing an indoor swimming pool, for not less than 95% of the annual hours of operation between — 18°C and 25°C for conditioned spaces with transitory occupancy; and 21°C and 24°C for all other conditioned spaces; or in climate zone 1, the 98th percentile zone cooling load across the hours of operation does not exceed 110% of the 98th percentile load in the corresponding zone of the reference building, across 95% of the assessable floor area; or in climate zone 8, the 98th percentile zone heating load across the hours of operation does not exceed 110% of the 98th percentile load in the corresponding zone of the reference building, across 95% of the assessable floor area; or in climate zones 2 to 7 — the 98th percentile zone cooling load across the annual hours of operation does not exceed 120% of the 98th percentile load of the corresponding zone of the reference building, across 95% of the assessable floor area; and the 98th percentile zone heating load across the annual hours of operation does not exceed 120% of the 98th percentile load of the corresponding zone of the reference building, across 95% of the assessable floor area; and the building complies with the additional requirements in Specification 33. (2) The annual greenhouse gas emissions of the proposed building may be offset by — renewable energy generated and used on site; and another process such as reclaimed energy, used on site. (3) The calculation method used for (1) and (2) must comply with — ANSI/ASHRAE Standard 140; and Specification 34. 34; and Specification 48.
Removed words are struck through; added words are highlighted. Comparison of the text only.