Specification clause · NCC 2025 Volume One

S13C7 Fire-stopping

Specification 13 Penetration of walls, floors and ceilings by services · NCC 2019: Spec C3.15: 7

Open S13C7 on NCC Online ↗

(1) Material: The material used for the fire-stopping of service penetrations must be concrete, high-temperature mineral fibre, high-temperature ceramic fibre or other material that does not flow at a temperature below 1120°C when tested in accordance with ISO 540, and must have—

demonstrated in a system tested in accordance with C4D15(2)(a) that it does not impair the fire-resisting performance of the building element in which it is installed; or

demonstrated in a test in accordance with (5) that it does not impair the fire-resisting performance of the test slab.

(2) Installation: Fire-stopping material must be packed into the gap between the service and wall, floor or ceiling in a manner, and compressed to the same degree, as adopted for testing under (1)(a) or (b).

(3) Hollow construction: If a pipe penetrates a hollow wall (such as a stud wall, a cavity wall or a wall of hollow blockwork) or a hollow floor/ceiling system, the cavity must be so framed and packed with fire-stopping material that is—

installed in accordance with (2) to a thickness of 25 mm all round the service for the full length of the penetration; and

restrained, independently of the service, from moving or parting from the surfaces of the service and of the wall, floor or ceiling.

(4) Recesses: If an electrical switch, socket, outlet or the like is accommodated in a recess in a hollow wall or hollow floor/ceiling system—

the cavity immediately behind the service must be framed and packed with fire-stopping material in accordance with (3); or

the back and sides of the service must be protected with refractory lining board identical with and to the same thickness as that in which the service is installed.

(5) Test: The test to demonstrate compliance of a fire-stopping material with this Specification must be conducted as follows:

The test specimen must comprise a concrete slab not less than 1 m square and not more than 100 mm thick, and appropriately reinforced if necessary for structural adequacy during manufacture, transport and testing.

The slab must have a hole 50 mm in diameter through the centre and the hole must be packed with the fire-stopping material.

The slab must be conditioned in accordance with AS 1530.4.

Two thermocouples complying with AS 1530.4 must be attached to the upper surface of the packing each about 5 mm from its centre.

The slab must be tested on flat generally in accordance with Section 10 of AS 1530.4 and must achieve an FRL of 60/60/60 or as otherwise required.

Same wording in NCC 2022 Volume One. See NCC 2022 Volume One S13C7.

Clauses referred to

Defined terms used