Specification 13 Penetration of walls, floors and ceilings by services
7 clauses · Open on NCC Online ↗
- S13C1 ScopeThis Specification prescribes materials and methods of installation for services that penetrate walls, floors and ceilings required to have an FRL.
- S13C2 ApplicationThis Specification applies to installations permitted under the Deemed-to-Satisfy Provisions of the NCC as alternatives to systems that have been…
- S13C3 Metal pipe systemsA pipe system comprised entirely of metal (excluding pipe seals or the like) that is not normally filled with liquid must not be located within 100…
- S13C4 Pipes penetrating sanitary compartmentsIf a pipe of metal or UPVC penetrates the floor of a sanitary compartment in accordance with C4D15(2)(c)(ii) — the opening must be neatly formed and…
- S13C5 Wires and cablesIf a wire or cable or cluster of wires or cables penetrates a floor, wall or ceiling— the opening must be neatly formed, cut or drilled and no…
- S13C6 Electrical switches and outletsIf an electrical switch, outlet, socket or the like is accommodated in an opening or recess in a wall, floor or ceiling— the opening or recess must…
- S13C7 Fire-stoppingMaterial: The material used for the fire-stopping of service penetrations must be concrete, high-temperature mineral fibre, high-temperature ceramic…