NCC 2025 Volume One
Specification 32 Construction of proscenium walls
6 clauses · Open on NCC Online ↗
- S32C1 ScopeThis Specification contains the requirements for the construction of proscenium walls for theatres, public halls, or the like.
- S32C2 Separation of stage areas, etcDressing rooms, scene docks, property rooms, workshops, associated store rooms and other ancillary areas must be— located on the stage side of the…
- S32C3 Proscenium wall constructionA proscenium wall must— extend to the underside of the roof covering or the underside of the structural floor next above; and have an FRL of not…
- S32C4 Combustible materials not to cross proscenium wallTimber purlins or other combustible material must not pass through or cross any proscenium wall.
- S32C5 Protection of openings in proscenium wallEvery opening in a proscenium wall must be protected— at the principal opening, by a curtain in accordance with S32C6 which is— capable of closing…
- S32C6 Proscenium curtainsA curtain required by S32C5 must be— a fire safety curtain— made of non-combustible material; and capable of withstanding a pressure differential of…