NCC 2025 Volume One
Specification 40 Lighting and power control devices
5 clauses · Open on NCC Online ↗
- S40C1 ScopeThis Specification contains the requirements for lighting and power control devices including manual switches, time switches, demand-operated…
- S40C2 Manual switchAn artificial lighting manual switch must be located in a visible and easily accessed position— in the room or space being switched; or in an…
- S40C3 Time switchA time switch must— be capable of switching on and off electric power at variable pre-programmed times and on variable pre-programmed days; and have…
- S40C4 Demand-operated controlA demand-operated control must— activate artificial lighting upon detecting the presence or movement of an occupant; and deactivate artificial…
- S40C5 Daylight sensor and dynamic lighting control deviceA daylight sensor and dynamic control device for artificial lighting must, in response to the measured level of available daylight in the range…