Table · ABCB Housing Provisions 2022
Table 13.2.6j Metal-framed suspended floor — thermal bridging mitigation
| Floor insulation from Tables 13.2.6a and 13.2.6d to 13.2.6h as applicable | Option 1 – increase insulation between floor framing to specified minimum R-Value | Option 2– add a layer of continuous insulation product above or below the floor framing with specified R-Value |
|---|---|---|
| 0.5 | 1.0 | 0.13 |
| 1.0 | 1.5 | 0.30 |
| 1.5 | 2.5 | 0.40 |
| 2.0 | 3.0 | 0.40 |
| 2.5 | 4.0 | 0.40 |
| ≥ 3.0 | X | 0.60 |
Table Notes
X = not permitted.
Minimum R-Values are in-situ values. They account for compression of insulation.
Table for 13.2.6 Floors and subfloor walls
Same wording in ABCB Housing Provisions 2025. See ABCB Housing Provisions 2025 Table 13.2.6j.