Table 13.2.6j Metal-framed suspended floor — thermal bridging mitigation

Part 13.2 Building fabric

Open Table 13.2.6j on NCC Online ↗
Floor insulation from Tables 13.2.6a and 13.2.6d to 13.2.6h as applicableOption 1 – increase insulation between floor framing to specified minimum R-ValueOption 2– add a layer of continuous insulation product above or below the floor framing with specified R-Value
0.51.00.13
1.01.50.30
1.52.50.40
2.03.00.40
2.54.00.40
≥ 3.0X0.60

Table Notes

X = not permitted.

Minimum R-Values are in-situ values. They account for compression of insulation.

Table for 13.2.6 Floors and subfloor walls

Same wording in ABCB Housing Provisions 2025. See ABCB Housing Provisions 2025 Table 13.2.6j.