Deemed-to-Satisfy Provision · NCC 2022 Volume One

J5D2 Application of Part

Part J5 Building sealing · NCC 2019: J3.1, NSW J(A)2.1

Open J5D2 on NCC Online ↗
Varied in NSW. Check the variation for your state.

The Deemed-to-Satisfy Provisions of this Part apply to elements forming the envelope of a Class 2 to 9 building, other than—

a building in climate zones 1, 2, 3 and 5 where the only means of air-conditioning is by using an evaporative cooler; or

a permanent building opening, in a space where a gas appliance is located, that is necessary for the safe operation of a gas appliance; or

a building or space where the mechanical ventilation required by Part F6 provides sufficient pressurisation to prevent infiltration.

Changed in NCC 2025. See NCC 2025 Volume One J5D2, or show what changed.

(1) The Deemed-to-Satisfy Provisions of this Part apply to — elements forming the envelope of a Class 2 3, 5, 6, 7, 8 or 9 building; and the external building fabric of a Class 4 part of a building. (2) Notwithstanding (1), the Deemed-to-Satisfy Provisions of this Part do not apply to 9 building, other than — a building in climate zones 1, 2, 3 and or 5 where the only means of air-conditioning is by using … required by Part F6 provides sufficient pressurisation to prevent infiltration.

Removed words are struck through; added words are highlighted. Comparison of the text only.

Can't meet J5D2? A Performance Solution must meet the Performance Requirements it satisfies: J1P1, J1P2, J1P3, J1P4. Start a Performance Solution →

State and territory variations all clauses side by side →

Defined terms used