NCC 2022 Volume One
Part J5 Building sealing
8 clauses · Open on NCC Online ↗
- J5D1 Deemed-to-Satisfy Provisions NSWWhere a Deemed-to-Satisfy Solution is proposed, Performance Requirements J1P1 to J1P4 are satisfied by complying with— J2D2; and J3D2 to J3D15; and…
- J5D2 Application of Part NSWThe Deemed-to-Satisfy Provisions of this Part apply to elements forming the envelope of a Class 2 to 9 building, other than— a building in climate…
- J5D3 Chimneys and fluesThe chimney or flue of an open solid-fuel burning appliance must be provided with a damper or flap that can be closed to seal the chimney or flue.
- J5D4 Roof lightsA roof light must be sealed, or capable of being sealed, when serving— a conditioned space; or a habitable room in climate zones 4, 5, 6, 7 or 8.…
- J5D5 Windows and doors NSWA door, openable window or the like must be sealed— when forming part of the envelope; or in climate zones 4, 5, 6, 7 or 8. (2) The requirements of…
- J5D6 Exhaust fansAn exhaust fan must be fitted with a sealing device such as a self-closing damper or the like when serving— a conditioned space; or a habitable room…
- J5D7 Construction of ceilings, walls and floorsCeilings, walls, floors and any opening such as a window frame, door frame, roof light frame or the like must be constructed to minimise air leakage…
- J5D8 Evaporative coolersAn evaporative cooler must be fitted with a self-closing damper or the like— when serving a heated space; or in climate zones 4, 5, 6, 7 or 8.