Deemed-to-Satisfy Provision · NCC 2022 Volume One

J6D3 Air-conditioning system control

Part J6 Air-conditioning and ventilation · NCC 2019: J5.2

Open J6D3 on NCC Online ↗

(1) An air-conditioning system—

must be capable of being deactivated when the building or part of a building served by that system is not occupied; and

when serving more than one air-conditioning zone or area with different heating or cooling needs, must—

thermostatically control the temperature of each zone or area; and

not control the temperature by mixing actively heated air and actively cooled air; and

limit reheating to not more than—

for a fixed supply air rate, a 7.5 K rise in temperature; and

for a variable supply air rate, a 7.5 K rise in temperature at the nominal supply air rate but increased or decreased at the same rate that the supply air rate is respectively decreased or increased; and

which provides the required mechanical ventilation, other than in climate zone 1 or where dehumidification control is needed, must have an outdoor air economy cycle if the total air flow rate of any airside component of an air-conditioning system is greater than or equal to the flow rates in Table J6D3; and

which contains more than one water heater, chiller or coil, must be capable of stopping the flow of water to those not operating; and

with an airflow of more than 1000 L/s, must have a variable speed fan when its supply air quantity is capable of being varied; and

when serving a sole-occupancy unit in a Class 3 building, must not operate when any external door of the sole-occupancy unit that opens to a balcony or the like, is open for more than one minute; and

must have the ability to use direct signals from the control components responsible for the delivery of comfort conditions in the building to regulate the operation of central plant; and

must have a control dead band of not less than 2°C, except where a smaller range is required for specialised applications; and

must be provided with balancing dampers and balancing valves, as required to meet the needs of the system at its maximum operating condition, that ensure the maximum design air or fluid flow is achieved but not exceeded by more than 15% above design at each—

component; or

group of components operating under a common control in a system containing multiple components; and

must ensure that each independently operating space of more than 1 000 m2 and every separate floor of the building has provision to terminate airflow independently of the remainder of the system sufficient to allow for different operating times; and

must have automatic variable temperature operation of heated water and chilled water circuits; and

when deactivated, must close any motorised outdoor air or return air damper that is not otherwise being actively controlled.

(2) When two or more air-conditioning systems serve the same space they must use control sequences that prevent the systems from operating in opposing heating and cooling modes.

(3) Time switches — the following applies:

A time switch must be provided to control—

an air-conditioning system of more than 2 kWr; and

a heater of more than 1 kWheating used for air-conditioning.

The time switch must be capable of switching electric power on and off at variable pre-programmed times and on variable pre-programmed days.

The requirements of (a) and (b) do not apply to—

an air-conditioning system that serves—

only one sole-occupancy unit in a Class 2, 3 or 9c building; or

a Class 4 part of a building; or

a conditioned space where air-conditioning is needed for 24 hour continuous use.

Table J6D3 Requirement for an outdoor air economy cycle

Climate zone

Total air flow rate requiring an economy cycle (L/s)

2

9000

3

7500

4

3500

5

3000

6

2000

7

2500

8

4000

Tables

Changed in NCC 2025. See NCC 2025 Volume One J6D3, or show what changed.

(1) An air-conditioning system — must be capable of being … of a building served by that system is not occupied; and must not use a single heating coil or a single cooling coil in an air-handling unit to serve more than one air-conditioning zone where one zone will require heating at the same time another requires cooling; and when serving more than one air-conditioning zone or area … by mixing actively heated air and actively cooled air; and serve diverse loads through modulating airflow to the maximum extent practicable; and limit zone-level reheating of air cooled by equipment upstream of the zone to not more than — for a fixed supply 7.5°C at any intended airflow rate; and limit zone-level re-cooling of air rate, a 7.5 K rise in temperature; and for a variable supply air rate, a 7.5 K rise in temperature heated by equipment upstream of the zone to not more than 7.5°C at the nominal supply air rate but increased or decreased at the same rate that the supply air rate is respectively decreased or increased; any intended airflow rate; and which provides the required mechanical ventilation, other than in … stopping the flow of water to those not operating; and with an airflow of more than 1000 L/s, must have a variable speed fan when its supply air quantity is capable of being varied; and when serving a sole-occupancy unit in a Class 3 building, must not operate when any external door of the sole-occupancy unit that opens to a balcony or the like, is open for more than one minute; and must have … must ensure that each independently operating space of more than 1 000 1000 m2 and every separate floor of the building has provision … the system sufficient to allow for different operating times; and where the design maximum heated water temperature is greater than 45°C, must have be capable of automatic variable temperature operation of heated water and chilled water circuits; and when deactivated, must close any motorised outdoor air or return air damper that is not otherwise being actively controlled. controlled; and must be capable of automatic variable temperature operation of chilled water circuits; and where fitted with a cooling tower, must automatically vary the condenser water set point temperature across the full range of condenser water inlet temperatures permitted by the equipment being served. (2) When two or more air-conditioning systems serve the same … systems from operating in opposing heating and cooling modes. (3) Time switches — the following applies: A time switch must be provided to control — an … a heater of more than 1 kWheating used for air-conditioning. The (4) A time switch under (3) must — be capable of switching electric power on and off at variable pre-programmed times and on variable pre-programmed days. days; and have the ability to program public holidays at least 1 year ahead; and be capable of being overridden by — a demand-operated control; or a manual switch; and allow the resumption of normal operation no longer than 2 hours after any override is activated. (5) The requirements of (a) (3) and (b) (4) do not apply to — an air-conditioning system that serves — only one sole-occupancy unit in a Class 2, 3 or 9c building; or only a Class 4 part of a building; or a conditioned … (L/s) 2 9000 3 7500 4 3500 5 3000 6 2000 1200 7 2500 8 4000 2000

Removed words are struck through; added words are highlighted. Comparison of the text only.

Can't meet J6D3? A Performance Solution must meet the Performance Requirements it satisfies: J1P1, J1P2, J1P3, J1P4. Start a Performance Solution →

Defined terms used