J8D3 Swimming pool heating and pumping
Part J8 Heated water supply and swimming pool and spa pool plant · NCC 2019: J7.3
(1) Heating for a swimming pool must be by—
a solar heater; or
a heater using reclaimed heat from another process such as reject heat from a refrigeration plant; or
a geothermal heater; or
a gas heater that—
if rated to consume 500 MJ/hour or less, achieves a minimum gross thermal efficiency of 86%; or
if rated to consume more than 500 MJ/hour, achieves a minimum gross thermal efficiency of 90%; or
a heat pump; or
a combination of (a) to (e).
(2) Where some or all of the heating required by (1) is by a gas heater or a heat pump, the swimming pool must have—
a cover with a minimum R-Value of 0.05; and
a time switch to control the operation of the heater.
(3) A time switch must be provided to control the operation of a circulation pump for a swimming pool.
(4) Where required, a time switch must be capable of switching electric power on and off at variable pre-programmed times and on variable pre-programmed days.
(5) Pipework carrying heated or chilled water for a swimming pool must comply with the insulation requirements of J6D9.
(6) For the purpose of J8D3, a swimming pool does not include a spa pool.
Changed in NCC 2025. See NCC 2025 Volume One J8D3, or show what changed.
(1) Heating Pipework circulating heated water for a swimming pool food preparation and sanitary purposes must be by — a solar heater; or a heater using reclaimed heat from another process such as reject heat from a refrigeration plant; or a geothermal heater; or a gas heater that — if rated to consume insulated in accordance with J6D9, including 500 MJ/hour or less, achieves a minimum gross thermal efficiency of 86%; or if rated to consume more than 500 MJ/hour, achieves a minimum gross thermal efficiency of 90%; or a heat pump; or a combination of (a) to (e). mm along each branch line. (2) Where some or all of the heating required by (1) is by a gas heater or a heat pump, the swimming pool Trace-heated pipework carrying heated water for food preparation and sanitary purposes must have — a cover be insulated in accordance with a minimum R-Value of 0.05; and a time switch to control the operation of the heater. J6D9. (3) A time switch building with gas heated water for food preparation and sanitary purposes must be provided with — reserved electrical capacity sufficient to control support future installation of air-source heat pump water heating equipment for food preparation and sanitary purposes assuming a nominal coefficient of performance of 3.25; and reserved space within the operation main electrical distribution board comprising at least one empty three-phase circuit breaker slot and 4 DIN rail spaces per 35 kW of a circulation pump water heating capacity labelled to indicate reservation for a swimming pool. future installation of heated water supply; and reserved space in the electrical riser or supply pathway for future water heating equipment, sized in accordance (a); and reserved plant area with — space to accommodate heating plant of 7 m² plus 0.04 m²/kW of heating capacity; and sufficient ventilation to achieve airflow of 115 L/s per kW of heating, with no recirculation of air. (4) Where required, a time switch The capacity and space required by (3) must be capable of switching electric power on sufficient to serve the same design load used to specify any gas-powered water heating equipment for food preparation and off at variable pre-programmed times and on variable pre-programmed days. (5) Pipework carrying heated or chilled water for a swimming pool must comply with the insulation requirements of J6D9. (6) For the purpose of J8D3, a swimming pool does not include a spa pool. sanitary purposes.
Removed words are struck through; added words are highlighted. Comparison of the text only.