Deemed-to-Satisfy Provision · NCC 2022 Volume Three

B1D3 General requirements

Part B1 Cold water services · NCC 2019: VIC B1.4(1), (2) and (3), NSW B1.4(1), TAS B1.4(1), B1.4

Open B1D3 on NCC Online ↗
Varied in NSW, TAS, VIC. Check the variation for your state.

A cold water service must be in accordance with AS/NZS 3500.1.

Changed in NCC 2025. See NCC 2025 Volume Three B1D3, or show what changed.

(1) A cold water service must be in accordance with AS/NZS 3500.1. (2) Notwithstanding (1), plastic pipes and fittings must not be used above-ground in combined sprinkler and hydrant systems.

Removed words are struck through; added words are highlighted. Comparison of the text only.

State and territory variations all clauses side by side →