Deemed-to-Satisfy Provision · NCC 2025 Volume Three
B1D3 General requirements
Part B1 Cold water services · NCC 2019: VIC B1.4(1), (2) and (3), NSW B1.4(1), TAS B1.4(1), B1.4
(1) A cold water service must be in accordance with AS/NZS 3500.1.
(2) Notwithstanding (1), plastic pipes and fittings must not be used above-ground in combined sprinkler and hydrant systems.
Changed since NCC 2022. See NCC 2022 Volume Three B1D3, or show what changed.
(1) A cold water service must be in accordance with AS/NZS 3500.1. (2) Notwithstanding (1), plastic pipes and fittings must not be used above-ground in combined sprinkler and hydrant systems.
Removed words are struck through; added words are highlighted. Comparison of the text only.
State and territory variations all clauses side by side →
- NSW Replaced Delete clause B1D3 and insert NSW B1D3 as follows: (1) A cold water service must be in accordance with AS/NZS 3500.1, with the…
- QLD Added Insert QLD subclause B1D3(3) in clause B1D3 as follows: (3) Notwithstanding (1), Appendix I of AS/NZS 3500.1 is adopted as an…
- TAS Replaced Delete clause B1D3 and insert TAS B1D3 as follows: (1) A cold water service must be in accordance with AS/NZS 3500.1. (2)…
- VIC Replaced Delete clause B1D3 and insert VIC B1D3 as follows: (1) A cold water service must be in accordance with AS/NZS 3500.1. (2)…