Performance Requirement · NCC 2022 Volume Three
B1P3 Access and isolation
Part B1 Cold water services · NCC 2019: BP1.2
(1) A cold water service must ensure access for maintenance of mechanical components and operational controls.
(2) A cold water service must ensure the system, appliances and devices can be isolated for testing and maintenance.
Changed in NCC 2025. See NCC 2025 Volume Three B1P3, or show what changed.
(1) A Access must be provided to components of a cold water service must ensure access for that require maintenance of or replacement including mechanical components devices and operational controls. (2) A cold water service must ensure the system, appliances and devices can be isolated for testing and maintenance.
Removed words are struck through; added words are highlighted. Comparison of the text only.