Performance Requirement · NCC 2025 Volume Three
B1P3 Access
Part B1 Cold water services · NCC 2019: BP1.2
Access must be provided to components of a cold water service that require maintenance or replacement including mechanical devices and controls.
Changed since NCC 2022. See NCC 2022 Volume Three B1P3, or show what changed.
(1) A Access must be provided to components of a cold water service must ensure access for that require maintenance of or replacement including mechanical components devices and operational controls. (2) A cold water service must ensure the system, appliances and devices can be isolated for testing and maintenance.
Removed words are struck through; added words are highlighted. Comparison of the text only.