Performance Requirement · NCC 2022 Volume Three
C2P6 Uncontrolled discharge
Part C2 Sanitary drainage systems · NCC 2019: CP2.1
A sanitary drainage system must avoid blockage and uncontrolled discharge.
Changed in NCC 2025. See NCC 2025 Volume Three C2P6, or show what changed.
A Any failure or uncontrolled discharge from a sanitary drainage system must avoid blockage and uncontrolled discharge. be avoided.
Removed words are struck through; added words are highlighted. Comparison of the text only.