Housing Provisions clause · ABCB Housing Provisions 2025

10.2.14 Shower area requirements

Part 10.2 Wet area waterproofing

Open 10.2.14 on NCC Online ↗

(1) Shower areas must be designed as either enclosed or unenclosed.

(2) Shower areas must incorporate a floor waste with falls complying with 10.2.12.

(3) Enclosed shower areas must incorporate—

stepdown complying with 10.2.15; or

hob complying with 10.2.16; or

level threshold complying with 10.2.17; or

preformed shower base complying with 10.2.19.

(4) Unenclosed shower areas must be constructed in accordance with 10.2.15 or 10.2.18.

Changed since NCC 2022. See ABCB Housing Provisions 2022 10.2.14, or show what changed.

(1) Shower areas must be designed as either enclosed or unenclosed — to include unenclosed. (2) Shower areas must incorporate a floor waste with falls complying with 10.2.12; and with a 10.2.12. (3) Enclosed shower areas must incorporate — stepdown complying with 10.2.15; or hob complying with 10.2.16; or level threshold complying with 10.2.17. 10.2.17; or preformed shower base complying with 10.2.19. (4) Unenclosed shower areas must be constructed in accordance with 10.2.15 or 10.2.18.

Removed words are struck through; added words are highlighted. Comparison of the text only.

Clauses referred to

Defined terms used