Housing Provisions clause · ABCB Housing Provisions 2025
3.4.1 Requirements for termite management systems
Part 3.4 Termite risk management · NCC 2019: 3.1.4.2
(1) The requirements of this Part apply where:
a Class 1 or 10 building is constructed in an area where subterranean termites are known to present a potential risk of attack; and
a primary building element of a Class 1 or 10 building is considered susceptible to termite attack.
(2) For the purposes of (1), a primary building element consisting entirely of, or a combination of, any of the following materials is considered not subject to termite attack:
Steel, aluminium or other metals.
Concrete.
Masonry.
Fibre-reinforced cement.
Timber — naturally termite resistant in accordance with Appendix C of AS 3660.1.
Timber — preservative treated in accordance with Appendix D of AS 3660.1.
Same wording in ABCB Housing Provisions 2022. See ABCB Housing Provisions 2022 3.4.1.
State and territory variations all clauses side by side →
- NT Replaced Delete subclause 3.4.1(2) and insert NT 3.4.1(2) as follows: (2) For the purposes of (1), a primary building element consisting…
- QLD Added Insert QLD subclause 3.4.1(3) in clause 3.4.1 as follows: (3) A termite management system installed in a Class 1 or 10 building…