ABCB Housing Provisions 2025
Part 5.7 Weatherproofing of masonry
6 clauses · Open on NCC Online ↗
- 5.7.1 ApplicationPart 5.7 applies subject to the limitation set out in H2D4(2)(c). (2) Part 5.7 need not be complied with if H2D4(2)(a) or (b) are complied with.
- 5.7.2 CavitiesFor masonry veneer, the clear width of a cavity between the masonry veneer and the exterior face of the supporting frame must not be— less than 25…
- 5.7.3 Damp-proof courses and flashings – materialDamp-proof courses and flashings must consist of— a material that complies with AS/NZS 2904; or embossed black polyethylene film of high impact…
- 5.7.4 Damp-proof courses and flashings – installationDamp-proof courses and flashings must be— located so as to form a continuous damp-proofing barrier— around the bottom perimeter of walls where…
- 5.7.5 WeepholesExcept where excluded by (2), open perpend joints (weepholes) must be created in the course immediately above any flashing (including above any…
- 5.7.6 Weatherproofing for single leaf masonry wallsA waterproof coating material must be applied to all external single skin masonry walls in accordance with the following: The coating must extend…