Deemed-to-Satisfy Provision · NCC 2025 Volume Three
C1D1 Deemed-to-Satisfy Provisions
Part C1 Sanitary plumbing systems · NCC 2019: C1.1
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirement C1P1 to C1P7 is satisfied by complying with C1D2 to C1D5.
(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Changed since NCC 2022 (minor wording). See NCC 2022 Volume Three C1D1, or show what changed.
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirement C1P1 to C1P7 is satisfied by complying with C1D2 and to C1D5. (2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Removed words are struck through; added words are highlighted. Comparison of the text only.
Clauses referred to
- C1P1 Disposal
- C1P7 Damage
- C1D2 Invert levels
- C1D5 Water efficiency
- A2G2 Performance Solution
- A2G4 A combination of solutions