Delete clause B1D3 and insert TAS B1D3 as follows:
(1) A cold water service must be in accordance with AS/NZS 3500.1.
(2) Notwithstanding (1), plastic pipes and fittings must not be used above-ground in combined sprinkler and hydrant systems.
(3) Cold water tanks forming part of a drinking water supply must comply with TAS B1D7.
(4) Backflow prevention for boundary containment must comply with the Network Utility Operator Boundary Backflow Containment Selection Requirements.
Exemptions
B1D3(1) does not apply to existing low-pressure gravity only water supply systems.
Changed since NCC 2022. See NCC 2022 Volume Three TAS B1D3, or show what changed.
Delete clause B1D3 and insert TAS B1D3 as follows: (1) The design, construction, installation, repair, alteration, additions, maintenance and commissioning of A cold water services service must be in accordance with AS/NZS 3500.1. (2) Notwithstanding (1), plastic pipes and fittings must not be used above-ground in combined sprinkler and hydrant systems. (3) Cold water tanks forming part of a drinking water supply must comply with TAS B1D7. (3) (4) Backflow prevention for boundary containment must comply with the Network … not apply to existing low-pressure gravity only water supply systems.
Removed words are struck through; added words are highlighted. Comparison of the text only.
The national clause
Other states and territories
- VIC Delete clause B1D3 and insert VIC B1D3 as follows: (1) A cold water service must be in accordance with AS/NZS 3500.1.…
- NSW Delete clause B1D3 and insert NSW B1D3 as follows: (1) A cold water service must be in accordance with AS/NZS 3500.1,…
- QLD Insert QLD subclause B1D3(3) in clause B1D3 as follows: (3) Notwithstanding (1), Appendix I of AS/NZS 3500.1 is…