H2D6 Roof and wall cladding
Part H2 Damp and weatherproofing · NCC 2019: 3.5.1-3.5.5
(1) Performance Requirement H2P1 is satisfied for gutters and downpipes if they are designed and constructed in accordance with one of the following:
Subject to (2), AS/NZS 3500.3.
Subject to (2) and (3), Part 7.4 of the ABCB Housing Provisions.
(2) The requirements of (1) do not apply to the removal of surface water from a storm having an annual exceedance probability of 1% for a Class 10 building where in the particular case there is no necessity for compliance.
(3) Part 7.4 of the ABCB Housing Provisions—
may only be used provided the roof drainage system is connected to a stormwater drainage system that complies with H2D2; and
excludes box gutters.
(4) Performance Requirement H2P2 is satisfied for roof and wall cladding if it is in accordance with H1D7(2), (3), (4), (5) or (6) as appropriate.
Changed since NCC 2022. See NCC 2022 Volume Two H2D6, or show what changed.
(1) Performance RequirementH2P1 Requirement H2P1 is satisfied for gutters and downpipes if they are designed … that complies with H2D2; and excludes box gutters. (4) Performance RequirementH2P2 Requirement H2P2 is satisfied for roof and wall cladding if it is in accordance with H1D7(2), (3), (4) (4), (5) or (5) (6) as appropriate.
Removed words are struck through; added words are highlighted. Comparison of the text only.