Deemed-to-Satisfy Provision · NCC 2025 Volume Two
H7D4 Construction in bushfire prone areas
Part H7 Ancillary provisions and additional construction requirements · NCC 2019: NSW 3.10.5.0, 3.10.5
(1) The requirements of (2) only apply in a designated bushfire prone area.
(2) Performance Requirement H7P5 is satisfied for a Class 1 building, or a Class 10a building or deck associated with a Class 1 building, if it is constructed in accordance with—
AS 3959; or
NASH Standard – Steel Framed Construction in Bushfire Areas.
Same wording in NCC 2022 Volume Two. See NCC 2022 Volume Two H7D4.
State and territory variations all clauses side by side →
- NSW Replaced Delete clause H7D4 and insert NSW H7D4 as follows: (1) The requirements of (2) only apply in a designated bushfire prone area.…
- QLD Added Insert QLD subclause H7D4(3) in clause H7D4 as follows: (3) The requirements of (2) do not apply when, in accordance with AS…
- SA Added Insert SA subclause H7D4(3) in clause H7D4 as follows: (3) Where a site is located in a designated bushfire prone area, the…