Deemed-to-Satisfy Provision · NCC 2025 Volume Two

H7D4 Construction in bushfire prone areas

Part H7 Ancillary provisions and additional construction requirements · NCC 2019: NSW 3.10.5.0, 3.10.5

Open H7D4 on NCC Online ↗
Varied in NSW, QLD, SA. Check the variation for your state.

(1) The requirements of (2) only apply in a designated bushfire prone area.

(2) Performance Requirement H7P5 is satisfied for a Class 1 building, or a Class 10a building or deck associated with a Class 1 building, if it is constructed in accordance with—

AS 3959; or

NASH Standard – Steel Framed Construction in Bushfire Areas.

Same wording in NCC 2022 Volume Two. See NCC 2022 Volume Two H7D4.

State and territory variations all clauses side by side →