NSW H7D4 Construction in bushfire prone areas
NSW Part H7 Ancillary provisions and additional construction requirements · varies H7D4 Construction in bushfire prone areas
Delete clause H7D4 and insert NSW H7D4 as follows:
(1) The requirements of (2) only apply in a designated bushfire prone area.
(2) Performance Requirement NSW H7P5 is satisfied for a Class 1 building, or a Class 10a building or deck associated with a Class 1 building, if it is constructed in accordance with—
AS 3959 except as amended by Planning for Bush Fire Protection; or
NASH Standard – Steel Framed Construction in Bushfire Areas except as amended by Planning for Bush Fire Protection; or
the requirements of (a) or (b) as modified by development consent or a bushfire safety authority issued under Section 100B of the Rural Fires Act 1997.
Changed since NCC 2022. See NCC 2022 Volume Two NSW H7D4, or show what changed.
Delete clause H7D4 and insert NSW H7D4 as follows: (1) The requirements of (2) only apply in a designated bushfire prone area. (2) Performance RequirementH7P5 Requirement NSW H7P5 is satisfied for a Class 1 building, or a Class … it is constructed in accordance with — AS 3959 except — as amended by Planning for Bush Fire Protection; and for Section 9 Construction requirements for Bushfire Attack Level FZ (BAL-FZ); or NASH Standard – Steel Framed Construction in Bushfire Areas except — as amended by Planning for Bush Fire Protection; and for buildings subject to Bushfire Attack Level FZ (BAL-FZ); or the requirements of (a) or (b) as modified by development consent following consultation with the NSW Rural Fire Service under section 4.14 of the Environmental Planning and Assessment Act 1979 if required; or (a) or (b) as modified by development consent with a bushfire safety authority issued under section Section 100B of the Rural Fires Act 1997 for the purposes of integrated development. 1997.
Removed words are struck through; added words are highlighted. Comparison of the text only.