Deemed-to-Satisfy Provision · NCC 2025 Volume One

B1D1 Deemed-to-Satisfy Provisions

Part B1 Structural provisions · NCC 2019: B1.0

Open B1D1 on NCC Online ↗
Varied in NSW. Check the variation for your state.

(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements B1P1 to B1P3 are satisfied by complying with B1D2 to B1D6.

(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.

Changed since NCC 2022 (minor wording). See NCC 2022 Volume One B1D1, or show what changed.

(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements B1P1 to B1P4 B1P3 are satisfied by complying with B1D2 to B1D6. (2) Where … be determined in accordance with A2G2(3) and A2G4(3) as applicable.

Removed words are struck through; added words are highlighted. Comparison of the text only.

State and territory variations all clauses side by side →

Clauses referred to

Defined terms used