Deemed-to-Satisfy Provision · NCC 2022 Volume One
B1D1 Deemed-to-Satisfy Provisions
Part B1 Structural provisions · NCC 2019: B1.0
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements B1P1 to B1P4 are satisfied by complying with B1D2 to B1D6.
(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Changed in NCC 2025 (minor wording). See NCC 2025 Volume One B1D1, or show what changed.
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements B1P1 to B1P4 B1P3 are satisfied by complying with B1D2 to B1D6. (2) Where … be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Removed words are struck through; added words are highlighted. Comparison of the text only.
Clauses referred to
- B1P1 Structural reliability
- B1P4 Buildings in flood areas
- B1D2 Resistance to actions
- B1D6 Construction of buildings in flood hazard areas
- A2G2 Performance Solution
- A2G4 A combination of solutions