Deemed-to-Satisfy Provision · NCC 2025 Volume One

B1D2 Resistance to actions

Part B1 Structural provisions · NCC 2019: B1.1

Open B1D2 on NCC Online ↗

The resistance of a building or structure must be greater than the most critical action effect resulting from different combinations of actions, where—

the most critical action effect on a building or structure is determined in accordance with B1D3 and the general design procedures contained in AS/NZS 1170.0; and

design for the actions in (a) accommodates expected 10-year deflection for structural substrates in Part F1; and

the resistance of a building or structure is determined in accordance with B1D4.

Changed since NCC 2022. See NCC 2022 Volume One B1D2, or show what changed.

The resistance of a building or structure must be greater … and the general design procedures contained in AS/NZS 1170.0; and design for the actions in (a) accommodates expected 10-year deflection for structural substrates in Part F1; and the resistance of a building or structure is determined in accordance with B1D4.

Removed words are struck through; added words are highlighted. Comparison of the text only.

Can't meet B1D2? A Performance Solution must meet the Performance Requirements it satisfies: B1P1, B1P2, B1P3. Start a Performance Solution →

Clauses referred to