Deemed-to-Satisfy Provision · NCC 2025 Volume One
F1D1 Deemed-to-Satisfy Provisions
Part F1 Water management · NCC 2019: F1.0
Varied in SA. Check the variation for your state.
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements F1P1 is satisfied by complying with F1D2 to F1D15.
(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Changed since NCC 2022. See NCC 2022 Volume One F1D1, or show what changed.
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements F1P1 to F1P4 are is satisfied by complying with F1D2 to F1D8. F1D15. (2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Removed words are struck through; added words are highlighted. Comparison of the text only.
State and territory variations all clauses side by side →
Clauses referred to
- F1P1 Managing rainwater impact on the building and adjoining properties
- F1D2 Application of Part
- F1D15 Wall cladding
- A2G2 Performance Solution
- A2G4 A combination of solutions