F1D11 Subfloor ventilation
(1) Subfloor spaces must—
be provided with openings in external walls and internal subfloor walls in accordance with Table F1D11 for the climatic zones given in Figure F1D11; and
have clearance between the ground surface and the underside of the lowest horizontal member in the subfloor in accordance with Table F1D11.
(2) In addition to (1), a subfloor space must—
be cleared of all building debris and vegetation; and
have the ground beneath the suspended floor graded to prevent water ponding under the building; and
contain no dead air spaces; and
have openings evenly spaced as far as practicable; and
have openings placed not more than 600 mm in from corners.
(3) In double leaf masonry walls, openings specified in (1) must be provided in both leaves of the masonry, with openings being aligned to allow an unobstructed flow of air.
(4) Openings in internal subfloor walls specified in (1) must have an unobstructed area equivalent to that required for the adjacent external openings.
(5) Where the ground or subfloor space is excessively damp or subject to frequent flooding, in addition to the requirements of (1) to (4)—
the subfloor ventilation required in (1) must be increased by 50%; or
the ground within the subfloor space must be sealed with an impervious membrane; or
subfloor framing must be—
where above ground, above-ground durability Class 1 or 2 timbers or H3 preservative treated timbers in accordance with AS 1684.2, AS 1684.3 or AS 1684.4; or
where in ground, in-ground durability Class 1 or 2 timbers or H5 preservative treated timbers in accordance with AS 1684.2, AS 1684.3 or AS 1684.4; or
steel in accordance with NASH Standard ‘Residential and Low-Rise Steel Framing’ Part 2.
Table F1D11 Subfloor openings and ground clearance
Climatic zone (see Figure F1D11)
Minimum aggregate subfloor ventilation openings without a membrane (mm2/m of wall)
Minimum aggregate subfloor ventilation openings having the ground sealed with an impervious membrane (mm2/m of wall)
Minimum ground clearance height where termite inspection or management system is not required (mm)
Minimum ground clearance height where termite inspection is required (mm) Note 1
A
2000
1000
150
400
B
4000
2000
150
400
C
6000
3000
150
400
Table Notes
400 mm clearance required only where termite management systems are installed that need to be inspected (see B1D4).
On sloping sites, the 400 mm clearance required by (1) may be reduced to 150 mm within 2 m of external walls.
In situations where openings in external walls and internal subfloor walls are not able to be provided, additional measures must be provided to ensure that the overall level of ventilation of the subfloor space is maintained.
Additional measures referred to in (3) may include measures similar to those in F1D11(5), such as providing durability class timbers, or having the ground sealed in the subfloor space with an impervious membrane.
Figure F1D11 Climatic zones based on relative humidity
Figure Notes
The season with the highest relative humidity is used. Generally this will be July for southern Australia and January for northern Australia.