Deemed-to-Satisfy Provision · NCC 2025 Volume One

F1D8 Damp-proofing

Part F1 Water management · NCC 2019: F1.12

Open F1D8 on NCC Online ↗
Varied in SA. Check the variation for your state.

(1) Except for a building covered by (3), moisture from the ground must be prevented from reaching—

the lowest floor timbers and the walls above the lowest floor joists; and

the walls above the damp-proof course; and

the underside of a suspended floor constructed of a material other than timber, and the supporting beams or girders.

(2) Where a damp-proof course is provided, it must consist of—

a material that complies with AS/NZS 2904; or

impervious sheet material in accordance with AS 3660.1.

(3) The following buildings need not comply with (1):

A private garage, tool shed, sanitary compartment, or the like, separate from or forming part of a building used for other purposes.

An open spectator stand or open-deck carpark.

New in NCC 2025. No F1D8 in NCC 2022 Volume One; it may have moved or been renumbered.
Can't meet F1D8? A Performance Solution must meet the Performance Requirements it satisfies: F1P1. Start a Performance Solution →

State and territory variations all clauses side by side →

Defined terms used