(1) A roof, balcony, podium or similar horizontal surface part of a building must be provided with a waterproofing membrane —

consisting of materials complying with AS 4654.1; and

designed and installed in accordance with AS 4654.2.

(2) Where a membrane required by (1) is applied to a concrete roof, balcony, podium or similar horizontal surface, the membrane must be installed directly on a structural substrate complying with F1D5.

Changed since NCC 2022. See NCC 2022 Volume One F1D7, or show what changed.

(1) If a floor A roof, balcony, podium or similar horizontal surface part of a room is laid on the ground or on fill, moisture from the ground building must be prevented from reaching the upper surface provided with a waterproofing membrane — consisting of the floor materials complying with AS 4654.1; and adjacent walls by the insertion of a vapour barrier designed and installed in accordance with AS 2870. 4654.2. (2) The requirements of Where a membrane required by (1) do not apply where — weatherproofing is not required; or the floor is the base of applied to a stair, lift concrete roof, balcony, podium or similar shaft which is adequately drained by gravitation or mechanical means. horizontal surface, the membrane must be installed directly on a structural substrate complying with F1D5.

Removed words are struck through; added words are highlighted. Comparison of the text only.

Can't meet F1D7? A Performance Solution must meet the Performance Requirements it satisfies: F1P1. Start a Performance Solution →

Clauses referred to