Deemed-to-Satisfy Provision · NCC 2025 Volume One
F6D1 Deemed-to-Satisfy Provisions
Part F6 Light and ventilation · NCC 2019: F4.0
Varied in SA. Check the variation for your state.
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements F6P1 to F6P5 are satisfied by complying with—
for a building containing an occupiable outdoor area, Part G6; and
for farm buildings and farm sheds, Part I3.
(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Same wording in NCC 2022 Volume One. See NCC 2022 Volume One F6D1.
State and territory variations all clauses side by side →
Clauses referred to
- F6P1 Natural lighting
- F6P5 Disposal of contaminated air
- F6D2 Provision of natural light
- F6D12 Kitchen local exhaust ventilation
- A2G2 Performance Solution
- A2G4 A combination of solutions