Deemed-to-Satisfy Provision · NCC 2025 Volume One
G3D5 Construction at balconies
Part G3 Atrium construction · NCC 2019: G3.5
If a bounding wall separating an atrium from the remainder of the building is set back from the perimeter of the atrium well, a barrier that is imperforate, non-combustible, and not less than 1 m high, must be provided.
New in NCC 2025. No G3D5 in NCC 2022 Volume One; it may have moved or been renumbered.