J5D7 Construction of roofs, ceilings, walls and floors
Part J5 Building sealing · NCC 2019: J3.6
(1) Ceilings, walls, floors and any opening such as a window frame, door frame, roof light frame, ventilation opening frame or the like must be constructed to minimise air leakage.
(2) Construction required by (1) must be—
enclosed by internal lining systems that are close fitting at ceiling, wall and floor junctions; or
sealed at junctions and penetrations with—
close fitting architrave, skirting or cornice; or
expanding foam, rubber compressible strip, caulking or the like.
(3) The requirements of (1) do not apply to openings, grilles, louvres or the like required for smoke hazard management.
Changed since NCC 2022. See NCC 2022 Volume One J5D7, or show what changed.
(1) Ceilings, walls, floors and any opening such as a window frame, door frame, roof light frame, ventilation opening frame or the like must be constructed to minimise air leakage in accordance with (2)— when forming part of the envelope; or in climate zones 4, 5, 6, 7 or 8. leakage. (2) Construction required by (1) must be — enclosed by … (3) The requirements of (1) do not apply to openings, grilles grilles, louvres or the like required for smoke hazard management.
Removed words are struck through; added words are highlighted. Comparison of the text only.