Deemed-to-Satisfy Provision · NCC 2025 Volume One
J6D7 Ductwork sealing
Part J6 Air-conditioning and ventilation · NCC 2019: J5.6
Ductwork in an air-conditioning system with a capacity of 3000 L/s or greater, not located within the only or last room served by the system, must be sealed against air loss in accordance with the duct sealing requirements of AS 4254.1 and AS 4254.2 for the static pressure in the system.
New in NCC 2025. No J6D7 in NCC 2022 Volume One; it may have moved or been renumbered.
Can't meet J6D7? A Performance Solution must meet the Performance Requirements it satisfies: J1P1, J1P2, J1P3, J1P4. Start a Performance Solution →