Table · NCC 2025 Volume One

Table J3D7s Metal-framed pitched roof with horizontal ceiling — minimum Total R-Value of ceiling to account for thermal bridging

Part J3 Elemental provisions for a Class 4 part of a building

Open Table J3D7s on NCC Online ↗
Ceiling insulation R-Value from Tables J3D7a to J3D7r and J3D7(1)(f) as applicableMinimum Total R-Value to account for thermal bridging
1.51.38
2.01.74
2.52.09
3.02.43
3.52.63
4.02.95
4.53.27
5.03.59
5.53.91
6.04.23

Table Notes

The Total R-Value calculation only includes the ceiling frame, insulation and ceiling lining. It is not to include the internal air films, roof space or roof lining.

Minimum ceiling Total R-Values are in-situ values. They account for compression of insulation.

Table for J3D7 Roofs and ceilings of a Class 4 part of a building

Same wording in NCC 2022 Volume One. See NCC 2022 Volume One Table J3D7s.

Clauses referred to

Defined terms used